Connect with us
[the_ad id="89560"]

Energy

‘They’re Gonna Pay For It’: A Texas Billionaire May Be About To Force Greenpeace USA Into Bankruptcy

Published

3 minute read

From the Daily Caller News Foundation

By Nick Pope

The Texas billionaire owner of a major pipeline company is on the precipice of potentially bankrupting Greenpeace USA, The Wall Street Journal reported on Sunday.

Kelcy Warren’s company, Energy Transfer, is seeking legal recourse against Greenpeace’s American arm in court, alleging that several Greenpeace USA entities paid for attacks against the company’s Dakota Access Pipeline and proliferated misinformation about the firm and its project in 2016, according to the WSJ. At the time, the project was a flashpoint in the environmental movement’s crusade against major fossil fuel infrastructure developments, and it was ultimately completed in 2017.

“Everybody is afraid of these environmental groups and the fear that it may look wrong if you fight back with these people,” Warren said in a televised interview in 2017, according to the WSJ. “But what they did to us is wrong, and they’re gonna pay for it.”

Eco-activists flocked to the construction site of the pipeline in North Dakota in 2016 to try to stop the $3.8 billion project from being built, and clashes between the protesters and law enforcement occasionally turned violent, according to the WSJ. The lawsuit, which seeks $300 million in damages, would probably crush Greenpeace USA, though it does not pose such a threat to Greenpeace’s international operations because the organization’s main organizing body based in the Netherlands does not own assets in the U.S.

The company tried to sue in federal court first, and refiled the suit in a state court after a federal judge threw out the original litigation, according to the WSJ. Energy Transfer is pursuing the lawsuit under a law that was originally created to go after the mafia.

As Warren — who once said that climate activists should be “removed from the gene pool” — sees it, Greenpeace USA was principally responsible for delaying the project’s construction and imposing millions of dollars of added costs on Energy Transfer, according to the WSJ. Greenpeace, meanwhile, maintains that the lawsuit could stifle free speech and that it only ever played a supporting role in the protests against the pipeline.

Moreover, Greenpeace USA is also preparing for a range of possible outcomes, including bankruptcy, while some of its leaders and members of the board have fought over what kind of settlement could be palatable, according to the WSJ.

“You’re not going to wear Kelcy Warren out, I can promise you that,” Matthew Ramsey, a director on Energy Transfer’s board, told the WSJ. “He will fight to the bitter end.”

Greenpeace USA did not respond immediately to a request for comment.

Daily Caller

Biden-Harris Admin’s Multi-Billion Dollar Electric School Bus Program Is A Huge Gift To China, House Report Finds

Published on

From the Daily Caller News Foundation 

By Owen Klinsky

The Biden-Harris administration’s $5 billion Clean School Bus Program uses nearly 400% more taxpayer dollars per school bus and benefits the Chinese Communist Party (CCP), a House report revealed Tuesday.

The 51-page report from the House Committee on Energy and Commerce found promoting electric school buses and other electric vehicles (EVs) enriches the CCP as the EV supply chain is roughly 90% dependent on China, raising both national security and human rights concerns. It also highlighted immense expenses for taxpayers, with the average electric school bus under the first iteration of the Clean School Bus Program — the first of three iterations — costing $381,191, nearly four times that of a typical full-sized diesel school bus.

“It is clear the $5 billion Clean School Bus Program is overall a failure and, in many cases, a waste of Americans’ hard-earned taxpayer dollars,” Republican Congresswoman Cathy McMorris Rodgers, who chairs the House Committee on Energy and Commerce, said in a statement regarding the report’s findings. “The program, led by the radical Biden-Harris EPA [Environmental Protection Agency], props up a market that relies heavily upon a supply chain dominated by the Chinese Communist Party.”

Funded by the 2021 Bipartisan Infrastructure Law, the Clean School Bus Program provided the Biden-Harris EPA with funds over five years to “replace existing school buses with zero-emission and clean school buses.”

China currently accounts for approximately two-thirds of global EV battery cell production, while the U.S. manufactured just 7% as of 2022, raising national security concerns as the U.S. would likely have to depend on Chinese EV technology for its electric school buses, according to the report. Furthermore, the government-subsidized purchases of electric school buses under the Clean School Bus Program incentivize pre-existing human rights abuses in the EV supply, including the use of Uyghur forced labor in China’s Xinjiang region.

The report also identified limited range as an issue, with standard electric school buses from leading manufacturer BlueBird able to travel just 120 miles on a single charge, while some propane models can travel 400 miles before needing to refuel. The range problem can also be exacerbated by cold and warm weather conditions, with a study from the National Renewable Energy Laboratory finding electric transit buses lose roughly a third of their range at 25 degrees Fahrenheit compared to ideal conditions.

Electric school buses also increase the risk of fraud due to a lack of documentation requirements for contractors, with the EPA relying solely on self-certified applications and estimates created by applicants, according to the report. A separate July report from a Maryland county’s Office of the Inspector General resulted in millions of dollars in “wasteful spending.”

“The EPA launched the Clean School Bus program without sufficient safeguards and considerations for practical hurdles applicants may face. For example, the EPA did not require documentation for some of the required application information and allowed contractors enthused at the opportunity to receive federal funding to apply on behalf of unknowing school districts, some of which eventually withdraw from the program,” the report states. “The EPA failed to account for the considerable electric infrastructure upgrades that electrifying a school bus fleet could require, potentially leading to delays for schools in utilizing their new buses.”

The White House did not immediately respond to a request for comment.

Continue Reading

Energy

US LNG uncertainty is a reminder of lost Canadian opportunities

Published on

From Resource Works 

Canada has missed opportunities to supply Europe with LNG due to political missteps and regulatory barriers, despite having the resources and potential.

For almost three years now, Europe has not been able to figure out how it will replace the cheap, plentiful supply of Russian gas it once enjoyed. Since Russia invaded Ukraine, the EU member states have made drastic moves to curtail their reliance on Russian energy, specifically Russian gas.

In an ideal world, the diversification of the EU’s energy supply would have been Canada’s golden opportunity to use its vast LNG capabilities to fill the gap.

Canada has all the right resources at its disposal to become one of the EU’s premier energy sources, with enormous natural gas reserves lying in the ground and shores upon three of the world’s four oceans. The problem is that Canada lacks both the right infrastructure and the necessary political will to get it built.

The fact that Canada is not a favored supplier of LNG to Europe is the consequence of political missteps and a lack of vision at the highest levels of government. It was reported by the Financial Times that outgoing United States President Joe Biden’s freeze on new LNG export permits and clashes with activists have created uncertainty over future supply growth.

Missteps and onerous regulatory barriers have kept Canada shackled and unable to reach its full potential, leaving us on the sidelines as other countries take the place that should have been Canada’s as an energy supplier for the democratic world.

To this day, European leaders like Greek Prime Minister Kyriakos Mitsotakis, German Chancellor Olaf Scholz, and Polish President Andrzej Duda have indicated their openness to adding Canadian LNG to their domestic supply.

However, no plans for supplying Canadian LNG to Europe have come to fruition. The absence of any commitment from the federal government to take those possibilities seriously is the result of decisions that now look like major mistakes in hindsight.

Two of these are cancelled energy projects on the Atlantic coast: the Energy East oil pipeline and the proposed expansion of an LNG terminal in New Brunswick.

Canada’s Pacific coast is now a hub of LNG development, with three planned facilities well underway, and there are hungry markets in Asia ready to receive their products. It is a shame that the Atlantic coast is being left behind during Canada’s burgeoning LNG renaissance. The economic situation in the Maritimes has long been challenging, leading to emigration to the Western provinces and stagnation back at home.

LNG projects in British Columbia have proven to be job machines and drivers of economic revitalization in formerly impoverished regions that were gutted when fishing, mining, and forestry went downhill in the 1980s.

The potential to both help Atlantic Canada level back up economically while becoming the bridge for energy exports to Europe was halted by the cancellation of the Energy East pipeline and a proposed LNG terminal in Saint John, New Brunswick.

Proposed by TransCanada (since renamed to TC Energy) to the National Energy Board in 2014, Energy East would have been a 4,600-kilometer pipeline with the capacity to transport over a million barrels of crude oil from Alberta to refineries in New Brunswick and Quebec. While it is true that Europe is more interested in LNG than crude oil, the completion of one great project encourages more and could have gotten the ball rolling on further energy infrastructure.

Had Energy East been constructed, it would have served as a symbol to investors and energy industry players that Canada was serious about west-to-east projects. Unfortunately, in 2017, TransCanada withdrew from the project due to regulatory disagreements and uncertainty.

In 2019, the federal government passed Bill C-69, AKA the “no more pipelines” law, leading to even more complex and restrictive regulations for new energy projects. When there should have been momentum on energy infrastructure building, there came only more cascading bad news.

proposed expansion of Repsol’s LNG terminal in Saint John, New Brunswick, another potential gateway for Canadian energy to get through to Europe, was abandoned due to the projected high costs and poor business case.

The idea of LNG on the East Coast making for a poor business case has been repeated by the federal government many times. However, in documents accessed by The Logic, it was revealed that Global Affairs Canada has, in fact, stated the opposite, and that there was great potential to increase rail and pipeline networks on the Atlantic.

Furthermore, Canada is capable of shipping LNG from the Western provinces to the East Coast because of our access to the vast pipeline networks of the United States.

As a result of these regrettable decisions, Canadians can only watch as lost opportunities to provide LNG to the democratic world are filled by other countries. Every downturn or disruption in the energy exports of other countries is a sore reminder of Canada’s lost opportunities.

Canada needs more vision, certainty, and drive when it comes to building the future of Canadian energy. In the words of Newfoundland and Labrador Premier Andrew Furey, “We will be all in on oil and gas for decades and decades to come…because the world needs us to be.”

Continue Reading

Trending

X